CMCE 1221 Construction Management I
Term Project: DOB Information & Site Visit Reports
Your project centers on a current, active construction project in New York City. You will
investigate the project on the DOB’s website and in person. DO NOT select a project for which
there is no DOB filing, you cannot determine the address, cannot visit in person, etc.
You will select the project and post its address to the Discussion Forum on Blackboard. No
duplicate projects will be allowed, so please sign up ASAP. First confirmed posting will claim
any given project.
Term Project Report Submission & Format (20 points)
Make sure your project is neat and professional, including the following guidelines:
1.
2.
•
•
•
•
•
•
3.
•
•
4.
Submission. Reports must be submitted via Blackboard as a single PDF file.
Report style. Write clearly and formally.
Use single spaced text for reports.
Use the report sections I give (see Project Content). Label each section with a clear
heading and use a page break for each section.
Use sub-sections with headings, not large paragraphs.
Use lists and bullet points to answer listing questions. Introduce each list with a brief
sentence describing what it is.
Use the Footer to identify yourself, class number, and project address.
Spell check.
Information sources. Caption all photos.
Photos taken on site must have a time/date stamp.
Photos from other sources must have a source listed. DO NOT list Google as a source
– use the destination source. Do not use urls as sources – use org info.
Quotes. Write in your own words. If you are quoting something, use quotation marks
and refer to your source. (i.e. According to ENR, X project began on April 2018 with
“major fanfare and road closures around downtown Brooklyn.”)
Term Project Content (80 points)
Construction Status Update: Select a construction site (Type: New Building or Alt-1) in the five
boroughs of NYC. Visit two (2) or more times on different dates.
Prepare a Site Visit Report of the project, containing the following:
COVER PAGE – Information on your report (1 page).
Should include the following:
•
•
•
•
Class information
Prepared by
Date
Project Name
Notes:
•
No logos that take up more than 1/3 of the page.
SECTION 1 – Project Filing (1 page + permit attachment).
Visit the project’s DOB Property Profile and review their filed permits. Introduce each
section with a brief sentence or two describing what it is.
Attach the following:
• Project filing summary including:
o Project Address
(“Premises”)
o Applicant of Record
Business Name and
Address
o Filing Representative
Business Name and
Address
o Owner’s Name, Business
Name and Address
Figure 1: Sample image with caption, via Source
•
•
Photo of the project’s permits at the construction fence or entrance. Caption the
photo and insert it into your text (use right click + insert caption). Refer to sample
of image attachment in FIGURE 1, above.
o Always refer to images in your writing when you include them in a report.
(See above sentence for example).
A current NB or Alt-1 permit (full page attachment).
o See printable permit sample on BB
SECTION 2 – Project Description (1 page + sketch).
Overview of the project to give the reader a sense of the overview of the project and its
construction logistics.
Introduce each section with a brief sentence or two describing what it is. Include the
following:
•
•
A physical description of the project in your own words (its intended size, some
material components, etc.).
o Always refer to images/attachments in your writing when you include
them in a report. (See SECTION 1 for example).
Site Logistics Sketch: a site plan of the site as you saw it including the project’s
location, cross streets, site fences, barricades, cranes or other heavy equipment.
o Attach 1-page PDF either digitally or hand-generated
o Include your name, project address
o Label all street names, equipment, and other objects shown.
SECTION 3 – Construction Status Report, per your observations (1 page per
report).
Two reports covering information gathered from your site. Introduce each section with a
brief sentence or two describing what it is.
Attach the following:
• Visit 1 Site Visit Report including 2 photos (see below for more detail)
• Visit 2 Site Visit Report including 2 photos (see below for more detail)
Site Visit Report Information:
You should plan to observe the site 20-30 minutes each visit. This report should be 12 pages for each visit and include the following:
• The project address
• The date and of visit
• Prepared by
• Weather during visit
• Summary of work observed (number of workers, type of work, materials and
equipment used)
• Safety precautions or issues observed if any (protection, barricades, tripping
hazards etc.)
• Attach two photos of the project site. Your photo should have a date/time
stamp. Caption each photo.
Each report must be neatly formatted as described and contain contents as described
above.
There is a sample site visit report on BB, but YOUR ARE RESPONSIBLE FOR
UPDATING IT TO MATCH MY FORMAT AND CONTENT REQUIREMENTS.
Keep in mind that you are reporting to the Owner of your company in preparation to
present to the Owner of the Project.
Site Visit Report
Project Address:
Date of Site Visit:
Time of Site Visit:
Temp/Weather During Visit:
Report Prepared by:
Work Observed:
Trade
# Workers
———————–
————
Description
———————————————————————————————————————————————–
———————————————————————————————————————————————————————————————
————
———————————————————————————————————————————————–
———————————————————————————————————————————————————————————————
————
———————————————————————————————————————————————–
———————————————————————————————————————————————————————–
Safety Precautions or Issues Observed:
Location
Description
——————————–
—————————————————————————————————————————————————————–
—————————————————————————————————————————————————————————————-Location
——————————–
Description
—————————————————————————————————————————————————————–
————————————————————————————————————————————————————————————————————————
—————————————————————————————————————————————————————–
—————————————————————————————————————————————————————————————–
Photos:
Figure 2: Sample photo and caption
Figure 3: Sample photo and caption

Purchase answer to see full
attachment

Don't use plagiarized sources. Get Your Custom Essay on
CMCE 1221 BMCC Construction Management DOB Information & Site Visit Report Term Project: DOB Information & Site Visit Reports…………………………
Just from $13/Page
Order Essay
superadmin

Share
Published by
superadmin

Recent Posts

Consider the following information, and answer the question below. China and England are internation

Consider the following information, and answer the question below. China and England are international trade…

3 years ago

The CPA is involved in many aspects of accounting and business. Let’s discuss some other tasks, othe

The CPA is involved in many aspects of accounting and business. Let's discuss some other…

3 years ago

For your initial post, share your earliest memory of a laser. Compare and contrast your first percep

For your initial post, share your earliest memory of a laser. Compare and contrast your…

3 years ago

2. The Ajax Co. just decided to save $1,500 a month for the next five years as a safety net for rece

2. The Ajax Co. just decided to save $1,500 a month for the next five…

3 years ago

How to make an insertion sort to sort an array of c strings using the following algorithm: * beg, *

How to make an insertion sort to sort an array of c strings using the…

3 years ago

Assume the following Keynesian income-expenditure two-sector model:

Assume the following Keynesian income-expenditure two-sector model:                                                AD = Cp + Ip                                                Cp = Co…

3 years ago