Categories: Homework on time

STFY590 Embry Riddle United Airlines Maintenance Facility Portfolio Project Work Facility: Advanced Air Location: Advanced Air Hangar Facility Details: 1

STFY590 Embry Riddle United Airlines Maintenance Facility Portfolio Project Work Facility: Advanced Air

Location: Advanced Air Hangar

Don't use plagiarized sources. Get Your Custom Essay on
STFY590 Embry Riddle United Airlines Maintenance Facility Portfolio Project Work Facility: Advanced Air Location: Advanced Air Hangar Facility Details: 1
Just from $13/Page
Order Essay

Facility Details: 100ftx150ft

Facility Hazards: Low light, low ventilation, Hard to find exists and Lack of oversight when Maintenance work i s being done due to the size.

Job: Maintenance done on aircraft wings

Hazards: Fall risk, If fall protection is not worn the fall can be fatal, Situational awareness,

you must submit a portfolio of projects (final paper submission in APA format). This portfolio must include the projects mentioned below:

Develop a general inspection form to assess a work facility or work unit (include in Appendices).
Develop a detailed inspection form targeting specific workplace hazards associated with an activity and equipment (include in Appendices).
Coordinate with a work organization to conduct a general inspection of a work facility or work unit and conduct a detailed inspection of a specific workplace activity and related equipment (use the forms you developed).
Develop a report summarizing inspection results, including a risk assessment of hazards identified and recommendations for hazard control if deficiencies are noted.
Coordinate with a work organization to complete a job safety analysis of a work task. The write-up should summarize the analysis and a completed analysis form should be included in the paper submission.

Risk Assessments on the hazards can be completed on the attached form. I have identified a few hazards at the top, but feel free to get creative and use your own.

All other forms must be created by you and attached in the appendices Risk Matrix
Severity
NEGLIGIBLE
MARGINAL
small/unimportant;
not likely to have a major
effect on the operation of
the event / no bodily injury
to requiring minor first aid
injury
CRITICAL
CATASTROPHIC
minimal importance;
has an effect on the
operation of event but will
not affect the event
outcome / requires medical
treatment
serious/important;
will affect the operation of
the event in a negative way
/ suffers serious injuries or
medical treatment of minors
maximum importance;
could result in disaster/death;
WILL affect the operation of the
event in a negative way / death,
dismemberment or serious
injury to minors
LOW (1)
MEDIUM (4)
MEDIUM (6)
HIGH (10)
LOW (2)
MEDIUM (5)
HIGH (8)
EXTREME (11)
MEDIUM (3)
HIGH (7)
HIGH (9)
EXTREME (12)
LOW
Probability
This risk has rarely
been a problem and
never occurred at a
college event of this
nature
MEDIUM
This risk will MOST
LIKELY occur at this
event
HIGH
This risk WILL occur
at this event, possibly
multiple times, and
has occurred in the
past
Explanation of Risk Ranking
LOW
MEDIUM
HIGH
EXTREME
If the consequences to this event/activity are LOW / MEDIUM, your
group should be OK to proceed with this event/activity. It is advised
that if the activity is MEDIUM, risk mitigation efforts should be made.
If the consequences to this event/activity are HIGH, it is advised that
you seek additional event planning support.
If the consequences to this event/activity are EXTREME, it is advised
that you do not hold this event without prior consultation with Risk
Management
Risk Assessment Table (Sample)
List All
Activities
Your activity name
Associated Risk(s)
Risk(s)
activity
associated
1.
Playing Chess in
Classroom A
Hiking on
Unsteady Terrain
with Elderly
participants
Traveling to
Boston with
students for a
conference
with
the
Severity
Level of impact on
the trip and
students
Probability Risk Score
The chances
of that risk
happening
Risk score, found by
combining impact
and probability on
the risk matrix
Method(s) to Manage the
Risk
A list of methods you will use to
minimize the chances of the risk
happening and/or the resulting
damages of the risk
Damaging College
property
2. Competition sparks
fighting among
participants
1. Bodily Injury to
participants
1. Negligible
1. Low
1. Low (1)
2. Negligible
2. Low
2. Low (1)
1. Critical
1. Low
1. Medium (6)
1. Educate participants regarding
conditions of activity,
appropriate footwear and
caution against risk of bodily
injury due to uneven terrain.
1. Auto Accident
1. Catastrophic
1. Low
1. High (10)
1. Ensure Drivers are
credentialed, use a College
vehicle to ensure it is properly
insured, educate passengers on
vehicle safety
Risk Assessment Table
List All
Activities
Your activity name
Associated Risk(s)
Risk(s) associated with the activity
Severity
Level of impact on
the trip and
students
Probability Risk Score
The chances
of that risk
happening
Risk score, found by
combining impact
and probability on
the risk matrix
Method(s) to Manage the
Risk
A list of methods you will use to
minimize the chances of the risk
happening and/or the resulting
damages of the risk
Risk Assessment Table
List All
Activities
Your activity name
Associated Risk(s)
Risk(s) associated with the activity
Severity
Level of impact on
the trip and
students
Probability Risk Score
The chances
of that risk
happening
Risk score, found by
combining impact
and probability on
the risk matrix
Method(s) to Manage the
Risk
A list of methods you will use to
minimize the chances of the risk
happening and/or the resulting
damages of the risk

Purchase answer to see full
attachment

superadmin

Share
Published by
superadmin

Recent Posts

Consider the following information, and answer the question below. China and England are internation

Consider the following information, and answer the question below. China and England are international trade…

4 years ago

The CPA is involved in many aspects of accounting and business. Let’s discuss some other tasks, othe

The CPA is involved in many aspects of accounting and business. Let's discuss some other…

4 years ago

For your initial post, share your earliest memory of a laser. Compare and contrast your first percep

For your initial post, share your earliest memory of a laser. Compare and contrast your…

4 years ago

2. The Ajax Co. just decided to save $1,500 a month for the next five years as a safety net for rece

2. The Ajax Co. just decided to save $1,500 a month for the next five…

4 years ago

How to make an insertion sort to sort an array of c strings using the following algorithm: * beg, *

How to make an insertion sort to sort an array of c strings using the…

4 years ago

Assume the following Keynesian income-expenditure two-sector model:

Assume the following Keynesian income-expenditure two-sector model:                                                AD = Cp + Ip                                                Cp = Co…

4 years ago