Work Breakdown Structure and Project Management Plan Worksheet This project requires Microsoft Project.There are two options on how to obtain a copy of MS Project:
Option : You may access 30-day free trials at the following locations: MS Project (for Windows users), Project Libre (for Mac users; Windows users should be able to use this as well), or SmartSheet (for Chrome Book users).
Your manager at your chosen company has asked you to create the project schedule using the MS Project software. You determined the scope, project deliverables, work packages (the lowest level of the work breakdown structure), and tasks for those work packages in the Discussion Board task this week(discussion board attached). For your chosen project, create a file in MS Project 2010 or a later version that includes the primary deliverables for your project decomposed to the work package level. This is called creating your project’s work breakdown structure (WBS). See the example below; however, this might not be as detailed as your project’s WBS might need to be. Your project WBS should include the following:
The project deliverables at the highest level
List all major deliverables.
An example of a project deliverable for remodeling a basement room, for example, would be Project Management Planning or Structural Work.
List all major project tasks down to the work-package level
The WBS level is achieved when the work can be accurately estimated (both cost and duration) and can be managed by one individual: the work package owner.
Note: In MS Project, your work should look like Example 1 below.
Submit your file as a Project document, as a PDF, or in a format provided or accepted by your instructor.
Example 1: WBS Created in MS Project
Remodel Basement Room
1.0 Project Management Planning
1.1 Project charter
1.2 Project management plan
1.3 Budget
1.4 Data gathering
1.5 Cost estimates
2.0 Structural Work
2.1 Frame walls and door
2.2 Install wallboard and tape/sand
2.3 Install egress window
3.0 Electrical Work
3.1 Install additional circuit
3.1.1 Upgrade electrical service
3.1.2 Install separate circuit for computer and lighting
3.2 Run wiring
3.3 Install outlets and ceiling lights
3.4.1 Install GFI outlets
3.4.2 Install track lighting opposite window
3.4.3 Test
4.0 Paint Room
5.0 Lay Carpet
Example 2: WBS Created in a Chart
Please submit your assignment.
For assistance with your assignment, please use your text, Web resources, and all course materials.
Consider the following information, and answer the question below. China and England are international trade…
The CPA is involved in many aspects of accounting and business. Let's discuss some other…
For your initial post, share your earliest memory of a laser. Compare and contrast your…
2. The Ajax Co. just decided to save $1,500 a month for the next five…
How to make an insertion sort to sort an array of c strings using the…
Assume the following Keynesian income-expenditure two-sector model: AD = Cp + Ip Cp = Co…